Multi-Stage Simultaneous Lot-Sizing and Scheduling
Planning of Flow Lines with Shifting Bottlenecks| By: | Florian Seeanner |
| Publisher: | Springer Nature |
| Print ISBN: | 9783658020880 |
| eText ISBN: | 9783658020897 |
| Edition: | 0 |
| Copyright: | 2013 |
| Format: | Page Fidelity |
eBook Features
Instant Access
Purchase and read your book immediately
Read Offline
Access your eTextbook anytime and anywhere
Study Tools
Built-in study tools like highlights and more
Read Aloud
Listen and follow along as Bookshelf reads to you
Due to a varying product demand (changing product mix) and different production speeds, bottlenecks may shift between the stages. In that case, a simultaneous lot-sizing and scheduling of these stages is recommendable. Hence, an improved version of the General Lot-Sizing and Scheduling Problem for Multiple production Stages (GLSPMS) was developed. Moreover, several reformulation techniques were applied to this model to solve it exactly. Besides, a new meta-heuristic which combines the principles of Variable Neighborhood Decomposition Search (VNDS) and Exchange was implemented to find good solutions, even for a real-world problem case. Finally, further model extensions, e.g., for scarce setup resources, were proposed.